Update minimum grid power threshold explanation (#1471)

Co-authored-by: Alex Stumpf <github@AlexStumpf.de>
This commit is contained in:
Alestrix 2021-09-04 09:08:06 +02:00 • committed by GitHub
parent 7b4b8660ba
commit 1defe1b9bd
No known key found for this signature in database
GPG key ID: 4AEE18F83AFDEB23

View file

@ -98,7 +98,7 @@ loadpoints:
phases: 3 # ev phases (default 3)
enable: # pv mode enable behavior
delay: 1m # threshold must be exceeded for this long
threshold: 0 # minimum export power (W). If zero, export must exceed minimum charge power to enable
threshold: 0 # grid power threshold (in Watts, negative=export). If zero, export must exceed minimum charge power to enable
disable: # pv mode disable behavior
delay: 10m # threshold must be exceeded for this long
threshold: 200 # maximum import power (W)