Fix docs uri

This commit is contained in:
andig 2022-04-29 17:28:59 +02:00
parent 33e86628ed
commit 2b53891cb6
9 changed files with 9 additions and 12 deletions

View file

@ -7,14 +7,14 @@ capabilities: ["1p3p"]
requirements:
description:
de: |
Benötigt mindestens Firmware 052.1 oder neuer.
Benötigt mindestens Firmware 052.1 oder neuer.
Für 1P/3P-Phasenumschaltung muss die HTTP API v2 im Charger aktiviert sein und es wird ein Sponsortoken benötigt. 💚
en: |
Requires firmware 052.1 or later.
For 1P/3P-Phase switching the HTTP API v2 in the charger setup needs to be activated and a sponsor token is required. 💚
uri: https://docs.evcc.io/docs/devices/chargers#go-echarger-homeprov3
uri: https://docs.evcc.io/docs/devices/chargers#go-echarger
params:
- name: host
render: |

View file

@ -1,11 +1,9 @@
template: openwb
products:
- brand: openWB
description:
generic: MQTT
requirements:
description:
en: The wallbox has to be configured running as a loadpoint.
en: The wallbox has to be configured as loadpoint.
de: Die Wallbox muss als Ladepunkt konfiguriert sein.
uri: https://docs.evcc.io/docs/devices/chargers#openwb
params:

View file

@ -12,7 +12,7 @@ requirements:
description:
en: An MQTT broker is required. The charger must be have a configured MQTT connection.
de: Es muss ein MQTT Broker installiert sein. Die MQTT Verbindung muss in der Wallbox eingerichtet sein.
uri: https://docs.evcc.io/docs/devices/chargers#tinkerforge-warp-charger
uri: https://docs.evcc.io/docs/devices/chargers#tinkerforge
params:
- name: fw2
required: true

View file

@ -8,7 +8,7 @@ requirements:
description:
en: DIP switch 10 must be set to 'ON'.
de: Im Gerät muss der DIP Schalter 10 auf 'ON' gestellt sein.
uri: https://docs.evcc.io/docs/devices/chargers#wallbe-ecopro
uri: https://docs.evcc.io/docs/devices/chargers#wallbe
params:
- name: host
- name: port

View file

@ -8,7 +8,7 @@ requirements:
description:
en: DIP switch 10 must be set to 'ON'.
de: Im Gerät muss der DIP Schalter 10 auf 'ON' gestellt sein.
uri: https://docs.evcc.io/docs/devices/chargers#wallbe-ecopro
uri: https://docs.evcc.io/docs/devices/chargers#eco-pro-vor-2019-mit-strommessgerät
params:
- name: host
- name: port

View file

@ -8,7 +8,7 @@ requirements:
description:
en: DIP switch 10 must be set to 'ON'.
de: Im Gerät muss der DIP Schalter 10 auf 'ON' gestellt sein.
uri: https://docs.evcc.io/docs/devices/chargers#wallbe-ecopro
uri: https://docs.evcc.io/docs/devices/chargers#eco-pro-vor-2019
params:
- name: host
- name: port

View file

@ -7,7 +7,7 @@ requirements:
description:
en: The Wallbe must be connected using Ethernet and the DIP switch 10 must be set to 'ON'.
de: Die Wallbox muss über ein Netzwerkkabel angebunden sein und im Gerät muss der DIP Schalter 10 auf 'ON' gestellt sein.
uri: https://docs.evcc.io/docs/devices/chargers#wallbe-ecopro
uri: https://docs.evcc.io/docs/devices/chargers#wallbe
params:
- name: host
- name: port

View file

@ -3,7 +3,7 @@ product:
description: HOME+, HOMEfix (V3)
capabilities: ["1p3p"]
description: |
Benötigt mindestens Firmware 052.1 oder neuer.
Benötigt mindestens Firmware 052.1 oder neuer.
Für 1P/3P-Phasenumschaltung muss die HTTP API v2 im Charger aktiviert sein und es wird ein Sponsortoken benötigt. 💚

View file

@ -1,6 +1,5 @@
product:
brand: openWB
description: MQTT
description: |
Die Wallbox muss als Ladepunkt konfiguriert sein.
render: