Commit graph

31 commits

Author SHA1 Message Date
andig
148aa76b67
SMA: remove remote control (BC) (#23906) 2025-10-03 14:51:12 +00:00
andig
b84f9060bd chore: fix mock 2025-08-28 14:04:42 +02:00
andig
b5a8a2d3c6
Integrate external optmizer (experimental) (#22495) 2025-08-17 09:39:11 +00:00
andig
42ed7da2e9
Add smart feed-in priority (#21813) 2025-06-27 09:03:46 +02:00
andig
efa34402b5 Revert "Add min/max physical current to loadpoint (#21187)"
This reverts commit ebbcabb838.
2025-06-19 08:20:56 +02:00
Michael Geers
ebbcabb838
Add min/max physical current to loadpoint (#21187) 2025-06-18 19:36:49 +00:00
Simon Schenk
e5b3ce8271
Config UI: cleanup circuit references (#21525) 2025-05-31 10:21:36 +02:00
andig
832012ef15
Planner: add precondition phase before departure (#20431) 2025-04-25 14:10:09 +02:00
andig
d09177b4b3
Config UI: remove references when deleting devices (#19832)
Co-authored-by: Michael Geers <michael@geers.tv>
2025-03-17 21:17:46 +01:00
andig
674591517f
Smart Cost: treat smart cost charging as inflexible for prioritisation (#19381) 2025-03-05 11:05:35 +01:00
andig
acbcf5461c
Planner: always create simple plan even if tariff errors (#19004) 2025-02-21 08:09:48 +01:00
andig
07fb01d28c
Loadpoint: cleanup phase configuration and drop deprecations (#18638) 2025-02-09 09:12:55 +01:00
andig
f93ceffa6d
Loadpoint: fix reentrant locks #2 (#18669) 2025-02-08 16:21:19 +01:00
Michael Geers
864c2cf599
Config UI: add loadpoints (BC) (#18137) 2025-01-31 12:26:23 +01:00
Maschga
a35a705e48
Add schedule for planner (#16091) 2024-12-01 12:53:11 +01:00
andig
0c343c1c0b chore: rebuild mocks 2024-11-01 16:36:37 +01:00
andig
16c467a65d
Loadpoint: add battery boost (experimental) (#16599) 2024-10-13 18:46:21 +02:00
andig
37d1f5861f
Loadpoint: add enable/disable delay apis (#16396) 2024-10-03 12:36:39 +02:00
andig
b0ea0582e2
Add battery grid charging (#14855) 2024-08-03 15:23:50 +02:00
andig
26973a0d2c
Load Management and Peak Shaving (#13207) 2024-04-27 10:50:35 +02:00
Michael Geers
93a1faf755
Smart grid charging per loadpoint (BC) (#12135) 2024-02-24 17:52:15 +01:00
rivengh
ed6bd89387
Battery control: hold battery while min soc not reached (#11941) 2024-02-03 13:39:58 +01:00
andig
648fe0cfdf
Persist phases/min/max current (BC) (#11571) 2024-01-27 11:25:27 +01:00
Martin Weinelt
daee304a49
chore: migrate from unmaintained mockgen (#11547)
The golang mock package has been archived and is now maintained by uber.

> Update, June 2023: This repo and tool are no longer maintained. Please
> see go.uber.org/mock for a maintained fork instead.

[1] https://github.com/golang/mock
[2] https://github.com/uber-go/mock
2024-01-08 11:13:27 +01:00
andig
a131678739
Loadpoint: expose active phases api (#11345) 2023-12-30 13:49:12 +01:00
andig
e1e703c4a7
Planner: don't touch plan when disabling due to soc/energy limits reached (#11030) 2023-12-19 18:10:01 +01:00
andig
d63dec9511
Refactor session settings and apis (BC) (#10335) 2023-12-02 20:56:30 +05:00
Michael Heß
5453820eb6
Add battery discharge control logic (#10553) 2023-11-09 12:42:39 +01:00
andig
fb20a3b585
Fix taking vehicle priorities into account (#8884) 2023-07-10 22:05:37 +02:00
andig
7c3ca53f02
Add dedicated co2 tariff (#8089)
---------

Co-authored-by: Michael Geers <michael@geers.tv>
2023-05-31 09:19:36 +02:00
andig
ccb1338d90
Add loadpoint prioritisation (#6107) 2023-02-19 15:36:18 +01:00