# Planner
|
|
|
|
The `planner` is responsible for developing a lowest-cost plan for charging a `required duration` until `target time`. A plan consists of a number of slots in ascending order of cost.
|
|
If the `planner` has an associated `tariff`, costs are derived from the tariff's prices. Without `tariff`, the planner will only evaluate time, but not cost.
|
|
The developed plan is then evaluated in terms of total cost and being "active". A plan is considered active when the current time is covered by one of the plan's slots.
|
|
|
|
## Cases
|
|
|
|
<img src="planner.svg" width="600">
|
|
|
|
## Edge cases
|
|
|
|
If time goal can not be met, the planner creates a continuous plan until up to required duration.
|